The proposed new pipeline system, to be named South Texas Gateway, would deliver crude oil and condensate from origination points in Wink and Midland, Texas to the existing Buckeye Texas Partners LLC (BTP) refining and export facilities in Corpus Christi. The pipeline is currently expected to be 24 in. dia. with a total capacity of up to 400 000 bpd with multiple segregations.

Anna Nicklin
Assistant Editor
Anna joined Palladian Publications in July 2016 and is currently working as an assistant editor on Hydrocarbon Engineering magazine. She is excited at the prospect of enhancing her industry knowledge through this role.
Anna recently graduated from the University of Nottingham with a first class BA (Hons) degree in English and Philosophy, where she spent much of her time editing articles for a student magazine.
Currently living in Camberley, Anna enjoys cooking, exercising and travelling in her spare time.



